Methods & sources
How plumb knows what it knows
Every number has a tag that says where it came from. Tap any tag on plumb to see its source and date.
What the tags mean
- ✓ Verified
From an official record: a government body, regulator or public agency, like the SCC, JLARC, EIA, the Census Bureau or a county.
- Researched
From a cited source that isn't an official record: a news report, a study, a tracker such as Cleanview, or a company page.
- ≈ Calculated
Our own math from public capacity and statewide totals. Always shown with its method and range. Not a measurement.
- Census
Census figures for the neighborhood (tract) around a site. They describe what is there, never what a data center caused.
- Estimated
Not fully checked: low research confidence, sources that conflict, or no source recorded. Treat it as an estimate.
- Demo
Illustrative only, and badged wherever it appears.
- No data
Nothing to show, or a live lookup failed. A blank is never shown as zero.
How we do the math
Where nothing is published, we calculate. These are the formulas behind every Calculated tag.
Electricity a year
MW × 8,760 h × 23 %
Show the math
Capacity (MW) × 8,760 hours × 23 % average draw, with a range of 18 to 30 %. The 23 % comes from Dominion's 2025 data-center peak (4 GW, in its letter to PJM of 6 Jan 2026) divided by the 17.3 GW of operating capacity Cleanview lists.
Homes equivalent
MWh ÷ 11.9 MWh per home
Show the math
Estimated MWh ÷ 11.9 MWh, the yearly electricity use of an average Virginia home (EIA 2023, Table 5A). It is a way to picture the size, not a count of homes served.
Water a year
Area total × share of capacity
Show the math
Sites in Loudoun share Loudoun's 952 million gallons (2025) in proportion to their capacity. Everywhere else, sites share Virginia's 2.1 billion gallons (2023, JLARC) in proportion to capacity. Planned sites are counted "if built". These figures are likely low.
Census context
ACS 2019–23, tract around the site
Show the math
Median rent, home value and household income come from the ACS 2019–23 5-year estimates for the tract around a site. They show what is nearby, not that a data center caused it.
Totals over a radius or county
Blanks left out, and counted
Show the math
Totals leave out facilities without capacity data and canceled sites, and say how many were left out beside the number. A blank is never counted as zero.
Good to know
Trade secret
Virginia keeps each site's power and water use secret
No public figure exists for any single data center. So every power and water number for a site on plumb is tagged Calculated: the right order of magnitude, not a meter reading.
How sure our research is
Every facility carries a rating. We show it, never hide it.
- High
- 101
- well documented
- Medium
- 499
- partly documented
- Low
- 153
- thin or conflicting
Facts from low-confidence rows, or rows with no recorded source, are tagged Estimated.
Limits
- Distances are straight lines from your address, not driving distance.
- Locations and capacity come from Cleanview and can be approximate. 67 facilities list no capacity, so they get no estimate.
- Zero complaints means none found in our research, not that there is no noise.
- Census tracts can be larger than the immediate neighborhood.
A caution on rent “change”It tracks inflation, not data centers.
The census data we hold includes a rent change figure. It compares two overlapping 5-year periods (2017–21 against 2019–23) in nominal dollars. It is not a two-year change, it is not adjusted for inflation, and the typical value (about +12 %) matches inflation. It is never a data-center effect, so plumb does not headline it. If it appears, it is labeled “ACS 2017–21 vs 2019–23 (overlapping, not inflation-adjusted)”, shown beside the county value and tagged Estimated.
Sources
58 sources behind the numbers on plumb, from data providers to the reports our research cites.
Show all 58 sourcesHide sources
Data and models (8)
- Cleanview — Virginia data centers
Facility list, status, location and listed capacity (retrieved Oct 2026)
- American Community Survey 5-year estimates, 2019–23 (US Census Bureau)
Rent, home value, household income by tract
- EIA — Electric Sales, Revenue, and Average Price (Table 5A, 2023)
Average Virginia home's electricity use, 11.9 MWh a year
- JLARC — Data Centers in Virginia (2024)
Statewide water, power and tax findings
- Dominion Energy letter to PJM (6 Jan 2026)
2025 data-center peak of 4 GW, basis for the 23 % average draw. No public link recorded in our research files.
- US Census Geocoder
Address matching, Virginia only
- Photon (OpenStreetMap data)
Address suggestions as you type
- OpenFreeMap
Map tiles
Cited in our research (50), most used first
- JLARC Data Centers in Virginia (2024) landing pagejlarc.virginia.gov8×
- Cardinal News: Data centers are drinking more water but overall water use in Virginia has gone down anywaycardinalnews.org7×
- Loudoun Now: Hemstreet presents $4.7B FY2026 budget with unprecedented data center revenuesloudounnow.com7×
- Manassas neighborhood battles noise from data centers (Prince William Times)princewilliamtimes.com7×
- ICPRB: Data Centers and Water Use in the Potomac River Basinpotomacriver.org6×
- Prince William Times: Perfect storm: drought, data centers and NDAsprincewilliamtimes.com6×
- Proposed Increase to Data Center Diesel Generator Use (Piedmont Environmental Council)pecva.org6×
- Inside Climate News - Virginia Regulators Approve New Dominion Ratesinsideclimatenews.org5×
- Inside Climate News: Virginia Fails to Require Data Centers Use Clean Energyinsideclimatenews.org5×
- Air Pollution and the Public Health Costs of AI (Caltech Linde Center)lindecenter.caltech.edu4×
- The Register: Virginia data center water consumption (FT analysis)theregister.com4×
- Broadband Breakfast: Dateline Ashburn: The Thirst for AI Raises Alarms in Virginiabroadbandbreakfast.com3×
- Data Centers: Noise & Air Quality Concerns (Loudoun County)loudoun.gov3×
- JLARC data centers study summary via UVA Weldon Cooper Centercoopercenter.org3×
- Potomac Local: Prince William bills to rise $203 under flat tax ratepotomaclocal.com3×
- Prince William Times: Digital Gateway nears a voteprincewilliamtimes.com3×
- Utility Dive - data centers PJM capacity auction (market monitor)utilitydive.com3×
- Virginia Court of Appeals affirms Digital Gateway rezonings void (American Battlefield Trust press coverage)battlefields.org3×
- Virginia Regulators Weigh Expanded Use of Data Centers' Polluting Generators (Inside Climate News)insideclimatenews.org3×
- WTOP: Judge voids Digital Gateway rezoning in Prince William Countywtop.com3×
- Board of Supervisors Approves New Data Center Zoning Ordinance Amendment (Fairfax County)fairfaxcounty.gov2×
- Insurance Journal (AP): Virginia Study on Data Centers Calls for Tighter Water Regulationsamp.insurancejournal.com2×
- Loudoun County: Data Centers - Appearance, Land Values and Workforceloudoun.gov2×
- Loudoun County: Data Centers: Water Considerationsloudoun.gov2×
- SELC press release - Dominion customers to see rate increaseselc.org2×
- Virginia Tightens Data Center Generator Permitting as Community Scrutiny Grows (Data Center Knowledge)datacenterknowledge.com2×
- Bay Journal - Data center growth will cost Virginia ratepayers (report finds)bayjournal.com1×
- Data Centers, Diesel Generators and Air Quality - PEC Web Map (Piedmont Environmental Council)pecva.org1×
- DataCenterDynamics / Data Center Knowledge coverage (search snippets only)datacenterknowledge.com1×
- Dominion contracted load coverage (search snippet only)datacenterdynamics.com1×
- Dominion Energy FY2025 Form 10-Ksec.gov1×
- Dominion Energy projections via secondary coverage (search snippet only)datacenterfrontier.com1×
- FFXnow: Volunteers begin mapping heat islands across Fairfax Countyffxnow.com1×
- George Mason Schar School: Study - Home Prices Are Higher When House Near a Data Centerschar.gmu.edu1×
- Letsdatascience: Study Raises Heat-Island Concerns Around AI Data Centersletsdatascience.com1×
- Lexington Institute - The Latest Stats on Datacenters and Residential Energy Costslexingtoninstitute.org1×
- Loudoun County: Data Centers - Tax Revenues and County Budgetloudoun.gov1×
- New WHO noise guidelines for Europe released (WHO Europe)who.int1×
- Paul Kedrosky: Chart of the day - data centers are creating heat islandspaulkedrosky.com1×
- PEC (Piedmont Environmental Council): Data Centers in Loudoun: A Primerpecva.org1×
- Prince William Times: County's environmental staff rejects Rural Crescent data center planprincewilliamtimes.com1×
- SELC: Virginia budget proposals fail to address data center threatsselc.org1×
- The Unpaid Toll: Quantifying the Public Health Impact of AI (arXiv 2412.06288)arxiv.org1×
- Virginia Business - Crossed wires over regional power expansionvirginiabusiness.com1×
- Virginia environmental regulators make info on data center operations more publicly accessible (Virginia Mercury) - UNVERIFIEDvirginiamercury.com1×
- Virginia Mercury - SCC approves Chesterfield gas plant and Dominion rate hikevirginiamercury.com1×
- Virginia Mercury - SELC appeals to state Supreme Court over Chesterfield gas plantvirginiamercury.com1×
- WHRO: New regulations beef up data center required water use reporting in Virginiawhro.org1×
- WJLA - Loudoun homeowners appear to lose battle with Dominion data center transmission lineswjla.com1×
- WV Press - residents oppose MARL transmission line (search snippet only)wvpress.org1×